Boat is coming together

It’s always great to be back onboard while floating at the dock. The familiar motion of the boat swaying with a bit of surge coming in from the marina entrance is comforting (and really helps you fall asleep!!). We still have jobs to do but we’re tackling them at a much slowly pace!

So far Mark and I have put up all 3 sails and moved the dinghy from the bow to its place at the stern. That process was very interesting. We’re in a narrow slip with power boats on each side. There was no way to lower the dinghy into the water at the bow and easily move it back. So Mark came up with a plan – we lowered the dinghy as usual (off the bow) and as I pulled it back to the stern, Mark tilted the far side of the dinghy up towards our boat. It awkwardly slid between our boat and the slip post! I sure wish I could have videoed the whole thing but I had my hands full!!

Mark has also been tinkering with the freezer. After initially getting it running on the weekend, it hasn’t been working properly. It took a bit of trial and error, adding more coolant and then releasing some to get the perfect amount. Now both fridge and freezer are working well.

I know you all probably don’t want to hear this but the heat down here is a killer!! The sun is very strong and there’s high humidity so we can only spend an hour or so outside before we need to hide inside our incredibly well air-conditioned boat. It really zaps your energy so our jobs are taking a bit more time. It would be great to open the boat up and give it a good airing out but there’s no way I’m turning off the air-con at this point. We’ll soon be off the dock and getting lots of fresh (hot) air inside.

Our friend John has been working away on his boat – much longer days than we were doing when we were still on the hard. John leaves here around 8am and usually gets back after 5pm. That’s a long time to be working in this heat. His launch day is Thursday so jobs must get done!! We’ve been having some nice meals together and chit chatting about our boats and all kinds of things at night. It’s been fun having John aboard.

So today is Nov. 4th. We’ve rented another car (one day rental) for Friday. The day after John’s boat goes in the water, we’ll do another shopping trip into San Juan. This time we’ll go to Costco and stock up on larger quantities of items. Time to make a list and start thinking about provisioning for the next 6 weeks or so.

Looking north from our stern.
Mark has to empty this lazarette in our cockpit to get access to the 2 refrigeration compressors.
View from our cockpit looking at the dinghy on the bow.
Mizzen going into place.
Funny thing happened when we installed the jib. We had a line attached to help raise the jib and that line wrapped around the main mast when Mark flicked it down. We got it down eventually!
Mark is trying to throw the safety rope up into the rigging to knock down the trapped line. The bag’s handle (dark red in the photo) broke so it went flying at me!
Working on the main sail now.
Attaching the lazy jack lines (helps hold the sail in place while it’s being lowered).
Cleaning and protecting the dinghy fabric before it goes in the water.
Now that’s a tight fit!!
At the stern just waiting to be attached to the davits.
Looking like a proper sailboat now!

At the dock

It’s been a very busy 3 days but now we can slow down a bit and catch our breath! On Thursday we kept up our pre launch pace and managed to complete all but a few minor jobs. Mark finished the installation of the chain plates for the drogue and I finished putting stuff away. It was another hot day so we spent time in the air-conditioned office getting info about our slip assignment and launch details and then we had a longer than usual lunch in some more air conditioning!!

Friday was a crazy busy day!! We were all up early, had breakfast and packed up the car with all our items. We made a quick stop at Walmart and were at the boat around 9 am. We did our last few jobs (dock lines and fenders put in place, ladder removed, etc). At 10:20 am (they were early – good thing we were ready) the travel lift and trailer arrived at our boat. They have an interesting storage system here. In order to fit as many boats as possible, they use the lift to get boats into the yard and then a remote controlled trailer to slide the boats into place with just a few inches between the boats.

When we were hauled out in April, we were the only boat in our area so no trailer was used. Watching the whole process for the first time was very interesting. Using a controller hung around his neck, the trailer operator maneuvered the trailer into position and slowly guided it under the boat. As the trailer went under, the stands holding Crimson Kathryn in place were removed!! By the time the trailer was fully in place, the boat was being held in place by 1 stand at the bow and 2 at the very stern – normal its 9 – 10 stands. The workers moved very sturdy supports into place and those supports held CK in place. The trailer also had supports that went under the keel so the boat was completed secure on it. They had a bit of a challenge moving us out the our spot because of all the mud. The front wheels of the trailer had difficulty finding traction at first and spun wildly before grabbing hold. Once we were on solid ground, the trailer moved us into position and the travel lift picked us up. The rest of the launch process was easy and we were in the water and getting the engine running by about 11:30 or so. John came onboard to help with our dock lines. We made a brief stop at the fuel dock and then headed to our slip (#889). Mark steered us in perfectly and we were secured by 12:30pm!

First job once we were settled was to get the air-conditioning running. John left to go back to his boat and we grabbed the laundry and headed over to the little market/restaurant to have some lunch. We were back at the lovely air conditioned boat later in the afternoon and discovered our fridge and freezer were not cooling – not great because we had food in the fridge!! Mark found some of the water cooling lines were clogged so he blew them out and things seemed to improve. Mark, John and I decided to have dinner out at the on-site restaurant (not the market/restaurant) and we enjoyed a fun Halloween night out.

We had big plans for Saturday which included getting a new one day rental car and returning the first rental car back to the San Juan Airport. Our plan was to do grocery shopping for the week and do a bunch of boat shopping all in San Juan. We wanted to get an early start but our refrigeration units had other plans. Neither were cooling!!! So Mark went back to work on them after breakfast. John left us to go get the new rental car (which is right on-site here) and I cleaned up from breakfast. About a hour later, Mark had solved our problem – both units needed more coolant. They were cooling like a charm as we headed to the 2 cars to drive into San Juan. It was a big shopping day and a very busy one and we didn’t get back to the boat until after 7pm! Long productive day!

Making a part for something (and making a mess inside that he nicely cleaned up!)
I’m putting lines and the running rigging for the sails out as
while Mark cleans the hurricane straps to be stored inside the boat.
Standing on the bow looking down the row of boats.
Attaching the chain plates to the hull at the stern.
The remote controlled trailer
Moving it into place
Off we go!
Ready to head to the water.
Almost splashed!
At the fuel dock!
First sunset from our slip at the dock.